Beginning of operations by AOC

1910

First discovery of oil at Khaur by AOC

1915

Commissioning of two small refining units at Morgah near Rawalpindi with the capacity of 2,500 BPD

1922

Discovery of oil in Dhulian and installation of Dubbs and Lummus Plants with the capacity of 5,500 BPD

1937

Discovery of oil at Meyal and Toot oilfields

1968

Incorporation of ARL

1978

Conversion of ARL into a Public Limited Company and its listing on three stock exchanges of the country

1979

Refining capacity was increased by the addition of two distillation units of 5,000 & 20,000 BPD capacity each

1981

Commissioning of dispatches of petroleum products through pipeline to Oil Marketing Companies (OMCs) with
computerized metering

1987

Effluent Treatment Plant

1996

Expansion and upgradation project with the installation of Heavy Crude Unit of 10,000 BPD and Catalytic
Reformer Complex of 5,000 BPD

1999

Commissioning of Captive Power Plant with the capacity of 7.5 MW

2000

ISO-9001: 2000 certification

2001

Production of Polymer Modified Bitumen (PMB)

2001

ISO-14001 certification

2002

OHSAS – 18001 certification

2006

ISO/IEC 17025:2005 Accreditation

2007

DCS (Distributed Control System) installation at two crude units of 5,000 and 20,000 BPD capacity.

2008

Crude and Product storage capacity enhanced gradually by 70% during the period 2002-2009.

2009

Completion of expansion and upgradation project comprising of a Preflash Unit of 10,400 BPD, Light Naphtha Isomerization unit of 7,000 BPD, Diesel Hydro desulphurization unit of 12,500 BPD, related auxiliary units (Hydrogen manufacturing, Sulphur Recovery, Sour Water Stripper & Amine Treating unit) and Utilities units. Capacity enhancement of Captive Power Plant by 18 MW.

2017